• Railway Electrification
  • Railway Electrification
  • Railway Electrification
  • Railway Electrification
  • Railway Electrification
  • Railway Electrification
  • Railway Electrification
  • Railway Electrification
Design of Farringdon ACDC Interface PDF Print E-mail

EPC Services have recently completed the complex design for replacement of the DC contactor system at Farringdon. The existing contactor system was life expired and Network Rail required a system to be introduced to trial a modern replacement without compromising safety or operational performance of the system.

The system was sucessfully completed to time and budget.